Static upgrading works of the underpass at runway 07/25, the main runway at Fiumicino Airport, to enable the landing and takeoff operations of new-generation aircraft (e.g., Airbus A380), which are characterized by very high weight. The structure, 150 meters long and 45 meters wide, underwent a complex series of retrofitting interventions designed to ensure that the works were carried out while maintaining full air traffic operations.
ADR S.p.A.
Detailed design and safety coordination during design phase
Roma Fiumicino Airport (RM)