Structural upgrade of the underpass at the runway 07/25 of Fiumicino Airport.

Structural upgrade of the underpass at the runway 07/25 of Fiumicino Airport.

Static upgrading works of the underpass at runway 07/25, the main runway at Fiumicino Airport, to enable the landing and takeoff operations of new-generation aircraft (e.g., Airbus A380), which are characterized by very high weight. The structure, 150 meters long and 45 meters wide, underwent a complex series of retrofitting interventions designed to ensure that the works were carried out while maintaining full air traffic operations.

Project Details

Client:

ADR S.p.A.

Services performed:

Detailed design and safety coordination during design phase

Localisation:

Roma Fiumicino Airport (RM)