The provincial road 65 ‘della Futa’ is the main link between the urban area of Bologna and the municipalities of the Savena Valley. The contract involves the construction of the final section to complete the new road alignment connecting the Ponte delle Oche and Via Corelli in the Municipality of Bologna. “Among the main works to be carried out: a steel and concrete viaduct with 5 spans, totaling 263 meters in length, an artificial tunnel of approximately 100 meters crossing the Bologna-Firenze railway line, two roundabouts, and several environmental mitigation interventions, all designed to minimize impact on the surrounding urban context while keeping vehicular, railway, and pedestrian traffic active.
Città Metropolitana di Bologna
Detailed design
Rastignano (BO)
Bridge Engineering (abbreviated to BRENG) is an engineering company specialized in in the design of bridges and large structures.
BRENG is made up of civil engineers united by a passion for engineering, the desire to offer quality services, the ability to adapt to changing environments and the determination to achieve their goals.
Cookie Policy | Policy Privacy
Breng.it © Copyright 2018. All Rights Reserved.