Breng completed the executive design of the facilities of the Sibaritide Hospital. Located close to the SS 106 Jonica state road, the large hospital structure is made of semi-prefabricated elements and is seismically isolated. All disciplines of design, architectural, structural and plant design interoperated in the BIM environment thanks to virtual three-dimensional models with information and graphic content in LOD E according to UNI 11337.
Anas
Bridge Engineering (abbreviated to BRENG) is an engineering company specialized in in the design of bridges and large structures.
BRENG is made up of civil engineers united by a passion for engineering, the desire to offer quality services, the ability to adapt to changing environments and the determination to achieve their goals.
Cookie Policy | Policy Privacy
Breng.it © Copyright 2018. All Rights Reserved.